Covid-19 diary – Kuritu II – 11 – Finished!

Well, the Kuritu rebuild is finished.  There might be a few little things to do, but the layout is definitely ‘substantially complete’, as they say in the trade.  Overall, I’m very happy with the results – one of the best things that I’ve ever done, I think.

Last time out, I left you, gentle reader, with this overhead view.

k1

Since then, I strung the overhead, and built the frame for the lights.  Really another baseboard, but strengthened by an aluminium section along its length.  And then LED strip attached and wired up.

k2

This is the end result.  The photos aren’t too kind on my woodwork, but hey, you’re meant to look at the layout not the baseboard….

k3

And the next job – a massive tidy up before returning to Minories.

And to close, a string of photos of the layout.  Photographs of ‘N’ are never kind on the models, but overall, these could be a lot worse…..

k4k5k6k7k8k9k10k11k12k13

About snitchthebudgie

Secretary of the East Surrey N Gauge railway club
This entry was posted in ESNG, Jon's layout ramblings, On my workbench and tagged , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.