About esngblog
This is the blog of the East Surrey N Gauge model railway club. Find out about our club activities here, as well as news and views on N-gauge railway modelling.-
Recent Posts
Recent Comments

John Doe on An amazing N-gauge couple… 
niasunset on Railex 2026 #1 
Allan Dawes on On my workbench – module… “Stuttgart 202… on Stuttgart 2025 – 4… 
Jonathan Caswell on Stuttgart 2025 – 4… Archives
Categories
Blogroll
Inspiration
N-gauge links
Our club website
Blog Stats
- 490,188 hits
Author Archives: snitchthebudgie
Prague trams, 2007
Another batch of photographs. In 2011 I went on a study tour of Prague and Vienna (I did pay for the privilege!), looking at flood defences and hydropower schemes. I was delighted to have a hotel room in Prague overlooking one … Continue reading
Posted in Out and about, Prototype, Traction
Tagged prague, prototype, traction, tram
Leave a comment
ESNG meeting – 19 February 2014
Last night was a ‘blast from the past’ evening. Ex-member Andy Smith and his young lady paid us a visit. And a very old friend of Derek the At * turned up. Duncan and John were ‘knitting’ – fitting overhead … Continue reading
Off my trolley – modelling traction in N
Let’s take a slight diversion away from layout design to consider what one might run on this N gauge traction layout. At moments like these I sometimes wish I had chosen HO to model in. There is a good range … Continue reading
Posted in Jon's layout ramblings, Layout design, Traction
Tagged model railroad, N gauge, Pacific Electric, traction
Leave a comment
ESNG modular systems
The ESNG works to two N-gauge modular systems. With our show coming up, perhaps a quick reminder of the standards is in order. The first is N-mod. This is an adaptation of the USA N-Track system, the main difference being … Continue reading
Posted in ESNG, Layout design, N Club International
Tagged ESNG, layout design, modular layouts, N gauge, N-Club International
Leave a comment
West Highland Railway, 1975
A long day down in the UK West Country yesterday, looking at computer models of flooding in the Somerset Levels. So I’ll post some more of my old holiday snaps! I hope to post another traction design article in a … Continue reading
ESNG Exhibition 2014
I have been putting together the (hopefully) final plans for our 2014 show. It’s a more of a challenge this year, as we are changing venues, largely due to increased hall charges. We knew our old venue very well, and … Continue reading
Posted in ESNG, ESNG meetings, Out and about
Tagged ESNG, ESNG Meetings, exhibition, modular layouts
Leave a comment
Black Swans? Dispatches from the front line of climate change.
It seems there are three things not to talk about in polite company – politics, religion and climate change. I can’t be that polite, as only politics is off limits…. However, this article gives a good history of the Dawlish … Continue reading
Somerset levels, February 2014
The damage to Dawlish is a bit of a side show to the ongoing flooding of the Somerset Levels. I did learn last week that ‘Somerset’ is a derivation of ‘Summer Land’ – in days gone by people only lived … Continue reading
ESNG meeting – 6 February 2014
Another slow start to tonight’s meeting and we thought we might not get any trains running. The Cha(I)rman was absent, claiming an early milk round the following morning, and Martin (snr) opted out of the drive from Leatherhead, claiming that you … Continue reading
Dawlish flooding
The latest gales and high tides have wrecked the iconic ex-Great Western Railway line along Dawlish Warren and the seafront of Dawlish town. It’s a far cry from the usual picture of GWR Kings and Castles on a sunny summer’s … Continue reading