Tag Archives: model railway

Covid-19 diary – Kuritu II – 3 – it moves!!

A quick update on Kuritu II.  Not much work done, as I’ve spent a lot of time putting up a fence at church, hedge cutting and shredding the prunings.  Plus, of course, rugby and a football match on television caused … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary – Kuritu II – 2

A spare trestle from the original layout made a set of legs for the new one.  Hinged at the back, making it easy to fold up and transport.  And a shelf for controller and tea cups.  I think that this … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary – Kuritu II – 1

I’m still fettling point blades for the Minories, but I thought that I needed a diversion. You may recall that I got Kuritu up and running during the first lockdown last year…. I then ran into the problem that a … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Some excellent viewing

Unfortunately, I’ve never seen Kier Hardy’s Hornsey Broadway at an exhibition (remember those?)  It is, though, one of the best models that I’ve seen for a long time.  If you’ve got a little time to spare, these two videos make … Continue reading

Posted in Inspiration, Layout design, Operation | Tagged , , | 1 Comment

‘OO9’ – Jon’s old trains #5

Turning out a few more boxes, and found some early, probably teenage, modelling.  My two favourite railway books at that time were these….. Don Boreham’s book is a classic.  Instructions in how to scratchbuild all that was needed for a … Continue reading

Posted in Inspiration, Jon's layout ramblings, Weird and wonderful | Tagged , , | Leave a comment

Covid-19 diary #31

Not much modelling progress, but pre-lockdown I did raid Champions in Dorking and came back with a stock of 6mm plywood.  The wood is all flat – the photo makes it look twisted. I’ve been looking at the mysterious boxes … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | 1 Comment

Covid-19 diary #30

Still no modelling progress.  It’s been great to see some of the club on Zoom, but I’m pining for club nights and exhibitions – and that’s a surprise for an anti-social loner like myself!  Still – I have read a … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary #29 – Planning failures!

Progress on the railway continues to be limited to say the least.  I continue to try and plan my next railway with little success.  So many ideas, and so few that really excite!  But the last few weeks have been … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary #28

I’ve got back to the Lowfits, but nothing to report at the moment.  Really, I’ve spent a lot of time thinking about what to model next, and then trying to understand the government conditions for us actually to hold an … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary #27

A little progress with the wagons.  I’ve 10 Peco Lowfits well on the way to completion.  The bodies have had their bolster bases scraped off with a knife blade and fine sandpaper.  They’ve been primed and a first coat of … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment