Tag Archives: modular layouts

Off my trolley – San Pedro

At the end of one line from LA and Watts were San Pedro and LA Harbour.  In the days of large ocean liners, collecting passengers from the liner and transporting them into LA generated a lot of traffic through San Pedro. San … Continue reading

Posted in Inspiration, Layout design, Prototype, Traction | Tagged , , , , | Leave a comment

ESNG meeting – 17 June 2015 – and AGM coming

We seem to be having a run of slow meetings.  On Wednesday only two of us were there between 7 and 7:30, to be joined by the Cha(i)rman who had been doing some accidental babysitting.  Four others arrived after 8, … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment

Off my trolley – Pacific Electric to Watts – 3

Finally, could one model the northern end, at Oscar’s junction, or the southern end, at Watts, of the four-track main line?  The prototype track layouts below are taken from the Model Railroader article.  Both have real potential as stand-alone layouts, but … Continue reading

Posted in Inspiration, Layout design, Prototype, Traction | Tagged , , , , | 3 Comments

Off my trolley – Pacific Electric to Watts – 2

Now for a couple of simple ideas for Pacific Electric N-mod modules.  I’ve selected two places where other lines crossed the four-track main line.  The first of these, nearest Watts, is at Slauson Tower, where the ATSF Harbor branch crossed the PE.  The … Continue reading

Posted in Inspiration, Layout design, Prototype, Traction | Tagged , , , , | Leave a comment

Off my trolley – Pacific Electric to Watts

Once again, it’s been a long time since I posted on traction and trolleys.  But I’m still thinking about modelling ideas, and while I wait, more interurbans and trolleys keep appearing on the Shapeways site. One of my issues with … Continue reading

Posted in Inspiration, Layout design, Prototype, Traction | Tagged , , , , | Leave a comment

ESNG meeting – 21 May 2015 – and AGM coming

Nothing to report from tonight.  I arrived to join Derek (with the beard and glasses), soon to be joined by Derek (with the beard and glasses).  No-one else turned up, not even the Cha(i)rman who is recovering from a bad back.  Paul … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment

ESNG PlayDay – 10 May 2015 – update

Paul corrected me on the record-breaking train: Hello Jon The new record is 147 wagons hauled by two Kato EF510 locomotives. It took 3min 32sec for the train to pass the camera, total length 54 feet 8 inches. In real … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment

ESNG PlayDay – 10 May 2015

May’s PlayDay started slowly, with just the 5 of us to set up the layout.  But Neil and Martin then arrived – unexpectedly, as we thought Neil was working and Martin was navigating an Eddie Stobart lorry somewhere in the … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment

ESNG meeting – 7 May 2015 – and PlayDay

No report from tonight’s meeting, as I am working in Albania for a week. But remember that there is an ESNG PlayDay on Sunday 10 May, 2-7pm, followed by curry.  This is our third regular Sunday meeting – the first … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment

ESNG meeting – 15 April 2015

There was a distinct post-exhibition lethargy amongst the members tonight.  We didn’t much feel like putting up the N-mod.  But then young Bruno arrived with trains to run, together with Paul and Peter, so we quickly got a small circuit together.  … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment