Tag Archives: N gauge

Off my trolley – modelling traction in N

Let’s take a slight diversion away from layout design to consider what one might run on this N gauge traction layout.  At moments like these I sometimes wish I had chosen HO to model in.  There is a good range … Continue reading

Posted in Jon's layout ramblings, Layout design, Traction | Tagged , , , | Leave a comment

ESNG modular systems

The ESNG works to two N-gauge modular systems.  With our show coming up, perhaps a quick reminder of the standards is in order.  The first is N-mod.  This is an adaptation of the USA N-Track system, the main difference being … Continue reading

Posted in ESNG, Layout design, N Club International | Tagged , , , , | Leave a comment

Off my trolley – branchlines 2 – North Hollywood

One of my many diversions away from railways is reading (almost anything).  This includes crime fiction.  One of my favourite authors is Michael Connelly and his Harry Bosch police procedurals – set in Los Angeles, and especially in the Hollywood area.  … Continue reading

Posted in Layout design, Traction | Tagged , , , | 2 Comments

Jon’s modules – Mojo coming back!

The mojo returneth (at least in part).  After an interlude that included reading the first 400 pages of Bishop Tom Wright’s 1600 page magnum opus on Paul, lumberjacking a 40 foot pine tree in the garden, and clearing up after my … Continue reading

Posted in Jon's layout ramblings, N Club International | Tagged , , , | Leave a comment

Hints and tips – N gauge handbrake

Browsing RMweb today (looking for I don’t know what) I came across this idea by Andy Gautrey on his Yakima Valley layout.  It is for HO, but I see no reason it won’t work in N. “There are also a few 2mm … Continue reading

Posted in Hints and tips | Tagged , , | Leave a comment

ESNG meeting – 15 January 2014

The Christmas and New Year were well and truly over, and we had a dozen or so members at last night’s meeting.  It was especially good to see Sean, and be able to congratulate him on a small addition to … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , | Leave a comment

How long to keep an old layout?

For the author, this would have been a academic question 15 years ago.  At that time I hadn’t actually ‘finished’ a layout.  This has only happened after joining ESNG and going ‘N’ gauge (after forays in OO, EM, OO9 and … Continue reading

Posted in ESNG, Jon's layout ramblings | Tagged , , , | Leave a comment

ESNG curry – 11 January 2014

Well, it is a meeting…..  And a very simple blog post. Eleven out of the expected twelve intrepid members of ESNG enjoyed the delights of the Earlswood Ruchita (yet again) to see in the New Year.  As ever food, service, … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , | Leave a comment

Review of 2013

It seems to be the done thing to produce a review of the year.  So what did 2013 bring for the Budgie: A total lack of modelling for 8 months, thanks to too much engineering to do, especially Chinese dams, … Continue reading

Posted in ESNG, General | Tagged , , , | Leave a comment

ESNG meeting – 2 January 2014

Well, who was going to turn up at the first meeting in 2014? We got a very creditable nine members in attendance, including Ian back after time out for a broken arm.  So we had a full circuit up and running.  … Continue reading

Posted in ESNG, ESNG meetings | Tagged , , , | Leave a comment