Too true (from somewhere on Facebook)

Posted in Inspiration, Layout design, Weird and wonderful | Tagged , , | Leave a comment

Minories – the next generation

There’s been a flurry of ‘Minories’ discussion again on RMWeb.  And here are a few of the new ideas.

Probably the optimum Minories arranagement, using two ‘Y’ points to reduce the reverse curves and straighten the platform.

An ‘almost’ Minories – it has a facing point entering the station, unlike the traditional plan.  This is more a scale version – it uses B6 points throughout, but is still quite compact.

I like this one.  Only two platforms, but extremely compact with some interesting pointwork.  This is drawn for PECO ‘OO’ points, but something similar would work in ‘N’.

American Minories.  A city Union Station, where the trains back into the station from the main line through the triangular junction.  The interest is in the switching to remove the head end cars and reform trains.  And latterly, USA passenger trains could be very short, so this layout could be operated fairly prototypically.

Finally, two different takes on the urban terminus.  In ‘O’ gauge, this layout omits one of the Minories crossovers.  Either it is assumed to be in the fiddleyard, or it is operated with one arrival and one departure platform.

And Priory Road – 2mm Finescale, and 5 feet long, modelling an urban terminus in deepest Essex.

Hope that’s given you all a few ideas!

Posted in Hints and tips, Inspiration, Layout design, Out and about | Tagged , , , | Leave a comment

Covid-19 diary #17

Well, here’s the end results of the last few week’s modelling.  A GWR bullion van and two LMS horseboxes.  All could be better, but all look pretty good to me.  I’ve really enjoyed building the etched bogies and chassis, and it’s wonderful how the multiple layers of etched detail give the right appearance.  I think the main bonuses are that the etched items are narrower than standard ‘N’ items, and more to scale that way, and that thin bits, like the W-irons on the horseboxes are suitable thin.

I did make a mess of some of the brake gear, but that was more detail than the original kit had anyway!

Elsewhere, the two Gresley full brakes are waiting for the roof to be painted and fitted and some touching up of paintwork.  And new buffers for one, as I broke one fitting the corridor connections.  Brass buffers look better and are stronger, even if they may not be quite the right type.

All the vehicles need numbering and lettering – simple enough if tiny for BR.  I must order some Fox transfers, I guess.  And they need couplings.  I seriously considered fitting these vehicles with DG or B&B couplings, but having tried making them, it was too much like hard work.  I can solder up a 2mm chassis, but those little couplings defeated me.  I reluctantly decided to stick with the standard ‘N’ Arnold style coupling.  Dapol knuckles look a little better, but are very expensive.  The horse boxes can easily have couplings fitted, using those in the kits or Dapol conversion kits.  The Gresley’s have NEM pockets.  I thought that the bogies for the bullion van could prove difficult, but it turns out that the NGS coupling pockets – rejected as useless for my Warwells – will work very well here.  Moral of the story, never throw anything away.

I must try and complete the Gresley’s tomorrow, then look to something new.  Perhaps one of these?  A 1991 London promotional vehicle for the then new TravelCards.  That’s what I call a real-life kit-bash!

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Odd modelling ideas #799

Just the five pictures for you today, hopefully to get the ideas flowing.

A real location on South African Railways.  Most companies lift the unused track before concreting!  But put it on your layout and wait for the comments….

A shot of the Chicago ‘L’ terminus.  A real life minimum space layout.  Shades of Minories?

Minimum space in ‘N’ – Australian style.

And finally, our backscenes are so, so boring!  How about this angry Berlin sky as a setting for your trains?

And an old-style Japanese station – 50’s or 60’s?  Again very modellable and a contrast to modern concrete paved track and bullet trains.

Posted in Inspiration, Out and about, Prototype | Tagged , , | Leave a comment

Covid-19 diary #16

Well, I’d hoped to show and tell a completed GWR bullion van today.  I’ve built the bogies, but when I looked at the body, there was a line of glue on the body side below the roof, where I’d reinforced the soldered joint.  It would have been obvious if I’d left if with such a slab-sided prototype, so I got the paint stripper out and took the body back to brass.  And then rubbed down the offending area.  After a coat of primer today, it looks a whole lot better.

I have made progress with the other workbench projects.  The two LMS horsebox bodies are primed, and one chassis complete.  And I went back to the Gresley full brakes to add the final details.  I confess that I left off a little bit of the pipework, especially after I found that it had broken on the sprue.  There’s now a little touching up of the paintwork needed, and these will be complete.

I’m also thinking of the next project.  I think that it might be a couple of these, though I have some more NGS and other plastic kits to build – this time of rather simpler vans.

Anyone spot the potential donor body and chassis?


I can, however, offer the usual modelling challenges.  Model of Newcastle, anyone?

And this colour picture of the quayside at Wells-next-Sea, Norfolk, in the 1930’s just oozes character and demands to be built.  The prototype used horses for shunting, but surely a tram engine could be excused?

And here’s one for the cameo modeller.  One for the high street (thank you N Gauge Forum.)  I understand that the sign was quickly replaced!

And one for the lineside. Who will be the first to ‘model’ this?? (Thanks, Paul.)

Nude sunbather mistaken for dead body near railway line in Essex

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Odd modelling ideas #798

An interesting prototype formation, as described by the photographer, Brian Gregory:

The unexpected shot. .1967…At times of heavy traffic at Weymouth, Western Region DMU’s were allowed to haul additional Loco’ hauled stock, subject to strict weight limitations. In this picture we see a Diesel Unit hauling a Bulleid Coach, an unusual combination which expired on the climb out of Weymouth. As happened so many times in the twilight years steam came to the rescue and in this case 4Mt 76007 is pushing the failed combination up the incline whilst hauling its own train at the same time !

Certainly one to confound the pundits on your railway, providing you can provide a suitable gradient.  But I do like the DMU hauling a green Bulleid coach – this could be modelled without the DMU failure.

And another take on ‘Three Bridges’.  From Wikipedia…

Three Bridges, properly known as Windmill Bridge, is a three-level crossing of bridges near Hanwell in west London, United Kingdom. Designed by Isambard Kingdom Brunel, the bridges are a clever arrangement allowing the routes of the Grand Junction Canal, Great Western and Brentford Railway, and Windmill Lane to cross each other: road above canal above railway. Work began in 1856, and was completed in 1859. The project was Brunel’s last before he died on 15 September 1859, just two months after its completion.

This staged Lyon’s Tea picture shows tea transported by road, rail and water.  More interesting than the cliché ‘bus on a bridge’ cameo, and just the sort of thing that us modellers like to squeeze onto our layout.

And as it is today….

Clever man, that Mr Brunel.

And who will make this first?

Posted in Inspiration, Out and about, Prototype | Tagged , , | Leave a comment

Covid-19 diary #15

Currently on the workbench….

An ex-GWR bullion van, dating back to Churchward’s days.  In reality, it only ran from Paddington to Bristol (I think).  It lasted long enough to be repainted from crimson to maroon, and was withdrawn in the mid-1960’s.  Not my modelling area, really, but I saw this brass kit at a show, and fell for it.  It’s an early brass etch, sold by Kemp Models, and shot down from a 4mm etch.  It only has doors on one side, perhaps for obvious reasons!

The camera is, of course, cruel, and especially shows where I’ve creased the tumblehome in the thin brass.  But it was fun to build and good soldering practice.  The bogies provided were terrible, so I’ve invested in these very nice etched ones.  All on nickel-silver – that is easier to solder as it conducts less heat.  All those layers of detail will be a challenge, and some will probably go on with superglue.

Hopefully, there’ll be a completed picture soon.

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

Covid-19 diary #14 – ESNG edition

It’s been good to get news that two ESNG members have been busy

Peter writes….

Good Afternoon

Hope everyone is keeping safe and well, although there seems to be some people who have no regards at all for the other people as the wife and I saw by the amount of rubbish left in two of our local parks yesterday.

Anyway, I thought I would just show that I have not been sitting around doing nothing whilst being in lockdown. The tram layout I am currently building is awaiting some street furniture which is on order. It’s in the garage at the moment, hence the stuff all round including the tumble dryer.

Unfortunately, when I took the photos, I had a power failure which turned to be a broken wire.

Note the high quality control panel bottom left of the third photo!

Incidentally, my club dashboard is currently undergoing some modifications including rebuilding part of the platforms. It can just be seen in the second photograph. Once satisfied, I will post a photo or two.

Kind regards

Peter

And Brian has also been busy…

Dear All,

Here’s the Tudela Veguin project (based on a Spanish station and major cement works) I’ve been working on this for some months now pre-lockdown and onwards.

You wondered where the toilet rolls went – some of them are featured 🙂 I’ve also had to eat a lot of Magnum ice creams for the cardboard …..

I know it’s not up to your high standards, but it’s been absorbing.

Enjoy, Cheers,

Brian

With the usual videos as evidence.

I also know that Mr Atfield has been building things at a rapid rate, but they will remain a mystery unless he enters the electronic age….

I did also notice on Brian’s YouTube channel, a video of the trains to the coast as lockdown rather crumbles…..

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

More Redhill pictures

Picture day today.  First, a string of pictures ‘borrowed’ from the local community Facebook page.  The first picture is fascinating.  The background housing looks the same today, but the area to the far side of the main line has been transformed – not necessarily for the better.

And moving across to Reigate….

A few odds and ends to finish with.  A Rebuilt Pacific in Exeter station on a stone train to (or from) Meldon Quarry.  Interesting to see what was once a top-rank passenger loco on an engineering train.  Probably waiting for a banker….

Possibly one of these – a ‘Z’ class 0-8-0T.

And the Lyme Regis branch in BR days.

Posted in Inspiration, Out and about, Prototype | Tagged , , , | Leave a comment

Covid-19 diary #13

A burst of action has just about completed the Warwells and Warflats.  I realised that I needed to fit a coupling to join with Rapido’s at each end of the rake of wagons.  A little length of brass wire did a good job.

I was getting fed up making my own couplings, and had a bright idea – a permanent coupling between pairs of wagons.  A little fettling with some scrap brass (probably from an etched ‘O’ gauge kit of my father’s) and a coping saw, then a dip in brass black made three of this little item.  It screws into the bogie pivots instead of a retaining washer, and works fine.

And this is where I had got to last night.  Just a few odds and ends to do….

So project nearly complete!  I need to replace one home made coupling that works, but is too short.  Handwheels need to be white, and the bogies could do with a touch of dirty black.  And if I am brave, I have the transfers for the lettering on the wagons.  But for now, they’ll go into their box, together with the two Gresley coaches and an SR bogie brake van that complete the train.

Lessons learnt?  I think #1 item was how hard it is to fit Rapido/Dapol couplings, NEM or otherwise, to kits.  I am minded to have another go at making DG/B&B couplings again.  #2 is just how useful a set of magnifying glasses are.  And lastly #3, how much nicer brass is to work with than plastic.

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment